Last snow storm for the year. The snowplow train set consisted of CDOT FL9 2011 followed by 2 coaches and FL9 2024 on the north end. Coming thru the Sinpatch Rd. RR crossing entering Ten Mile Rive... (more)
Last snow storm of the year. Metro North had this train setup with CDOT FL9 2011 two coaches and CDOT FL9 2024 on the north end. Snowplow train to keep the upper Harlem Line open.
Deadhead run to Grand Central Terminal for the evening rush. 2011 is backed by Metro North FL9 2017 as heads towards the Croton River bridge.
CDOT FL9M 2011 backed by Metro North F10 411 are about to stop at Ten Mile River Station. Next stop is Wassaic the end of the line. Midday snow storm covering the front of former New Haven FL9 20... (more)
1120 Waterbury - Bridgeport shoves south away from Beacon Falls